Skip to main content »
Igorotage

Pilando Section Collapse Solution: Here are the Short-Term and Long-Term Plans

Find out how officials plan to address the Pilando Section collapse with immediate road fixes and the proposed Pilando Cable-Stayed Bridge.

 |  4 min read

Discover the short-term and long-term strategies for the Pilando Section collapse in Buguias, Benguet, including a new route and bridge construction.

The Current Situation

On August 23, the feared event occurred as the Pilando Section of the Halsema Highway in Buguias, Benguet was entirely wiped out. This area has been a significant issue for some time. Earlier this year, Congressman Eric Yap had initiated plans to address this with the construction of the Pilando Cable-Stayed Bridge.

The Pilando Section of the Halsema Highway completely wiped out on August 23, 2024.

Before the Collapse

To understand the extent of the damage, view the following video of the Pilando Section before it was wiped out:

Immediate Response: Exploring Alternate Routes

With the road completely gone, immediate solutions are critical. One key option is establishing an alternate route. A potential route has been identified just above the washed-out section in Barangay Gambang, Bakun.

The collapsed Pilando Section of Halsema Highway

"Yesterday, we identified a potential alternate route in the Pilando area, just above the washed-out portion. We will start looking for funds for its road opening and improvement, and we will use this road for the next few years." - Congressman Eric Yap

This route will reduce travel time and costs for commuters, especially those transporting vegetables. Although other routes are available, they are longer and more expensive, making this new route crucial.

Construction of the Pilando Cable-Stayed Bridge: A long-term solution for the Pilando Section collapse. Estimated at 2.2 billion pesos and managed by DPWH.

Long-Term Solution: The Pilando Cable-Stayed Bridge

Congressman Yap also emphasizes the Pilando Cable-Stayed Bridge as a vital long-term solution. Coordinated with the Department of Public Works and Highways (DPWH), the project is estimated to cost 2.2 billion pesos and will be completed in multiple phases over several years.

"We will look for funds to start Phase 1 next year. After my visit to Pilando earlier this year, we coordinated with the DPWH and tasked them to propose a permanent solution-the bridge." - Congressman Eric Yap

The bridge will provide a durable infrastructure solution to the issues in the Pilando Section.

Pilando Cable-Stayed Bridge: A long-term infrastructure solution for Pilando Section collapse.

Moving Forward

The Pilando crisis requires both immediate and long-term actions.

"This is not a matter of choosing which comes first; it has to be both. While we work on the alternate route, we need to start on the bridge that some say is impossible to build. It's time to roll up our sleeves and triple our efforts." - Congressman Eric Yap

Addressing both short-term and long-term needs is essential. Community support and patience are crucial as we navigate this challenge. Reflecting on past difficulties, there is confidence that we will overcome this situation as well.

Looking Ahead

The Pilando situation, though severe, highlights an opportunity for resilience and collective effort. By addressing both immediate and long-term needs, we can build a more reliable infrastructure for the future. This effort requires the support and patience of the entire community to effectively resolve the crisis.

Alternative Routes for Pilando Section Collapse

South Bound Routes:

  1. Abatan-Mankayan-Cervantes Road

  2. Acop Cosalan Road (Buguias-Kabayan-Bokod)

North Bound Routes:

  1. Natubleng-Nabalicong-Cabuguiasan-Pacso-Amlimay-Central Buguias Road (Challenging due to steep and rough conditions; vehicle maintenance is essential.)

  2. Km.74 Arc-Saclalan-Tonglo-Pacso-Gusaran Kabayan (Recommended for light vehicles; some sections are rough.)

  3. Carmen via Bitalag to Bessang Pass to Cervantes

  4. Sookan-Gambang-Taneg-Guinaoang

  5. Km.21, Labey-Lacamen-Ambuklao Road

  6. Halsema via Timbac KM53, exit at Kabayan Bario Gusaran Highway (Quicker for light vehicles; improved road conditions but still steep.)

FAQ

1. What happened to the Pilando Section of the Halsema Highway?

On August 23, the Pilando Section of the Halsema Highway in Buguias, Benguet, was completely wiped out due to severe damage. This section has long been a significant issue, prompting immediate and long-term measures.

2. What are the immediate solutions for the Pilando Section collapse?

In response to the collapse, an alternate route has been identified just above the washed-out section in Barangay Gambang, Bakun. This route will help reduce travel time and costs while a more permanent solution is developed.

3. What is the long-term plan to address the Pilando Section issue?

The long-term solution involves the construction of the Pilando Cable-Stayed Bridge. Estimated to cost 2.2 billion pesos, the project will be completed in phases over several years, coordinated with the Department of Public Works and Highways (DPWH).

4. How will the Pilando Cable-Stayed Bridge solve the problem?

The Pilando Cable-Stayed Bridge is designed to provide a durable infrastructure solution for the Pilando Section. It will address the recurring issues by offering a reliable and stable crossing, mitigating future disruptions.

5. What alternate routes are available for travel around the collapsed section?

Several routes are available for travel, including:

  • Abatan-Mankayan-Cervantes Road
  • Acop Cosalan Road (Buguias-Kabayan-Bokod)
  • Natubleng-Nabalicong-Cabuguiasan-Pacso-Amlimay-Central Buguias Road (challenging conditions)
  • Km.74 Arc-Saclalan-Tonglo-Pacso-Gusaran Kabayan (rough sections)
  • Carmen via Bitalag to Bessang Pass to Cervantes
  • Sookan-Gambang-Taneg-Guinaoang
  • Km.21, Labey-Lacamen-Ambuklao Road
  • Halsema via Timbac KM53, exit at Kabayan Bario Gusaran Highway (improved but still steep)

6. How soon will the alternate route be operational?

The alternate route identified in Barangay Gambang, Bakun, is expected to be opened and improved shortly. Efforts are underway to secure funding and make the necessary improvements to facilitate immediate travel needs.

7. What are the expected challenges for the alternate and long-term routes?

The alternate route will help with immediate travel but may face challenges related to rough terrain and limited capacity. The long-term bridge project will involve significant construction efforts, requiring extensive coordination and time to complete.


Sharing is caring, kailian!

We do hope you find something great in this story. If you find this helpful, please do share it with the people you care about.


Igorotage is a platform for people to share their thoughts and ideas. The views expressed on Igorotage are the opinions of the individual users, and do not necessarily reflect the views of Igorotage.

Comments

Sign in to share your thoughts. No account yet?

What to learn next?

You might also like to read more related articles filed under Road Updates — or jump to a random article!

Road Updates Surprise me

Kennon Road in Tuba, Benguet Not Passable Due to Road Slip

Kennon Road in Tuba, Benguet closed due to road slip on Sept 7, 2024. Use Marcos Highway or Asin Road as alternate routes.

Sep 9 · 2 min read

Pilando Section of Halsema Highway Reopens After 9 Days of Hard Work

Main Pilando Section of the Halsema Highway officially reopens after 9 days of repairs. Critical damage fixed. Travelers advised to stay cautious.

Sep 3 · 1 min read

Benguet Vice Governor Felipe Clarifies Arrangement with Pilando Lot Owner

Benguet Vice Governor Ericson Felipe provides details on the rental agreement with the Pilando lot owner for a one-year term.

Sep 3 · 2 min read

Pilando Alternate Route Now Open for Motorists

Pilando alternate route open as of August 29, 2024. For 4x4 and light vehicles only. Read about current road conditions and traffic control.

Aug 29 · 3 min read

The Real Hero of Pilando: Family Sacrificed Land for Road Repair

Family sacrificed their land for the Pilando road repair, showcasing Binnadang and Igorot culture. They're the real heroes.

Aug 29 · 3 min read

Good News: Construction of Temporary Alternate Route in Pilando Sinking Area Begins

Good news: Construction of a temporary alternate route in Pilando's sinking area begins August 26, restoring access after the road collapse.

Aug 25 · 2 min read

Travel Alert: Bontoc-Baguio Road Not Passable - Safety Advisory | March 2024

As of March 06, 2024, the Bontoc-Baguio Road is closed due to a forest fire. Travelers must detour via Sagada-Balili for safety.

Mar 6 · 2 min read

Giselle Bulahao: Igorot Triumphs as Top Lady Darter in the Philippines 2023

Giselle Bulahao, an Igorot from Benguet, named the Chris Sports Lady Darter of the Year 2023 for her dominance in the Philippine dart scene.

Jan 6 · 2 min read

Victory Liner Sleeper Bus Involved in Fatal Motorcycle Accident in Tabuk City

A Victory Liner sleeper bus collided with a motorcycle in Tabuk City, resulting in the death of a woman and injuries to her husband and two children.

Nov 13, 2023 · 1 min read

Halsema Highway: Your Ultimate Travel Guide

Explore Halsema Highway's beauty and adventure. Your ultimate travel guide to the Cordillera's scenic gem.

Oct 15, 2023 · 11 min read